« Back

2009 News


12 August 2009

The Dunquin partners are now committed to drilling a well

The Irish Department of the Communications, Energy and Natural Resources has been notified that the second phase of the licence has been entered

........Read more >>


11 August 2009

Eni has farmed into Dunquin

Additionally SOSINA has farmed into the adjacent Eni operated FEL 1/99 ........Read more >>


1 August 2009

The Spanish Point 3D seismic survey has been completed

The data processing contract has been awarded to WesternGeco Limited ........Read more >>


22 June 2009

The Spanish Point 3D seismic survey has commenced

An area of 300 square kilometres is included in the survey that will be done by the vessel BOS Angler. ........Read more >>


28 January 2009

Contract for Spanish Point 3D Seismic Survey Awarded

300 Sq kilometer seismic survey to be acquired in Q2/3 2009 by the world's first "geophysical toolbox" vessel BOS Angler operated by Bergen Oilfield Services (BOS).

........Read more >>



« Back